Required Residential Inspections
- Footing. Consult the Footing Elevation Certificate before scheduling your inspection
- Foundation
- Plumbing/Electrical/Mechanical underslabs
- Garage Floor Slabs
- Basement Floor Slabs
- Fireplace (masonry only)
- Sewer Service Line – From Building to Main Tap. Call Utilities: 913- 971-9311
- Electrical (Temporary Service for Construction Trailer/Site) – a separate electrical application is needed for temporary electrical permit
- Rough-In (All framing, plumbing, electrical, HVAC, complete gas pressure). Consult the Residential Rough-In Priority List before scheduling your final inspection
- Portal prior to stucco application or other cover up
- Firewall separation – nail patterns
- Nail patterns (Narrow wall bracing, garage portal etc.)
- Insulation Inspection (if using prescriptive energy method)
- Final Approval – All inspections need to be complete before a Certificate of Occupancy (CO) or Temporary Certificate of Occupancy (TCO) is issued. Consult the Residential Final Priority List before scheduling your final inspection
- Special inspections or after-hours third-party inspections are acceptable for concrete placement or structural framing
-
Final inspections are scheduled after all fees have been paid
Re-inspection Fees
- Re-inspection fees are $100
- Re-inspection fees may be assessed in the following situations:
- The project is not ready for the requested inspection
- The previously inspected non-compliant items have not been corrected
- Address or permit numbers are not posted
- Construction activities continue without prior approval
- Structures are not accessible
- Buildings are occupied without City authorization
Temporary Certificate of Occupancy (TCO) Fees
- TCO fees are non-refundable
- $100 - Residential one-family and two-family dwellings
- $200 - Reinstate an expired Temporary Certificate of Occupancy
After-hours Inspections
- The minimum fee is $100 per hour with a two hour minimum
- After hour inspections are subject to staff availability
- Special inspections or after-hours third-party inspections are acceptable for concrete placement or structural framing
Residential Final Inspections
- A final grading and landscaping inspections are required before a Certificate of Occupancy is issued
Additional Resources
- Cold Weather Concrete Policy
- Construction Guidelines and Standards
- IBC Physical Security Requirements
- IRC Physical Security Requirements
Call 913-971-6200 for additional information.