Please join the City of Olathe for an virtual informational meeting to discuss the improvements scheduled to begin soon on Stevenson St. (Sheridan St. to Cedar St.), Walker St. (Stevenson St. to East End Dead End), and Grace Terrace (Stevenson St. to East End Cul-de-sac).
In addition to the replacement of the existing asphalt pavement, curb and gutter, and sidewalk, this street reconstruction project will include:
- Waterline replacement
- Stormwater improvements
- Installation of missing segments of sidewalk
- Replacement of driveway approaches (within the right-of-way)
- Installation of City owned streetlights
Construction will be ongoing through this Fall.
Zoom Link: https://gbateam.zoom.us/j/99781217731
Meeting ID: 997 8121 7731
Beginning at 4:30 p.m., there will be a short presentation every half hour followed by a Q&A. Representatives from the City, design consultant (GBA), and contractor (V.F. Anderson Builders) will be present to answer questions. Feel free to join at your convenience and leave once your questions have been answered.